Scope
Complete overhaul & upgrade of the Jetty Cranes (Berths 1 & 2)
The project featured
- Fluid: Mineral Oil (ISO 32)
- (ISO 32)
- Set of manifold blocks
- Replace all hydraulic pipe work (S/Steel 316L)

Fluid: Mineral Oil (ISO 32)
30kW Hydraulic Power Unit (ATEX)
Hydraulic pipe work (S/Steel 316L)